NewSpace AtlasSearch

LYOBA

PAVE's heavy kick stage, designed to take payloads of up to 5 tons from low Earth orbit to geostationary orbit, medium Earth orbit or a lunar trajectory in under 24 hours.

Why it matters

Satellites dropped in low orbit often spend six to twelve months spiraling up on electric thrusters before they can earn money. A fast chemical tug would cut that to a day and give defense users a way to reposition quickly.

How the technology works

LYOBA uses storable bipropellants rather than cryogenic fuels, so the propellant can sit in orbit for long periods. PAVE builds its propulsion, avionics and structures in house and has converted a former power plant in Valais into an engine test site.

A first in-space mission, GRAZE, was scheduled for October 2026 to test avionics.

Sources

  1. Greater Geneva Bern area (GGBA)Mar 30, 2026
  2. Niederer Kraft Frey (counsel to PAVE Space) via Legal 500Mar 26, 2026
  3. The Next WebMar 25, 2026

Updated Oct 22, 2026 · How we source facts · Suggest a correction